5L20
Congratulations and thank you for purchasing a Rubbermaid storage building.
BEFORE YOU BEGIN – BUILDING CODES
Be sure to check your local building codes, ordinances and restrictions, and applicable neighborhood governances.
BEFORE YOU BEGIN – SURFACE PREPARATION
To ensure proper assembly and performance your shed needs to be built on a solid, level surface.
A concrete or patio surface, or a treated-wood platform is recommended.
BEFORE YOU BEGIN – LOCATION
When choosing a location in your yard make sure you choose an area with easy access and one that provides
proper drainage for water to run away from the shed location.
BEFORE YOU BEGIN – PREASSEMBLY
Thoroughly review all assembly steps (it is important
that the steps are followed in the correct order).
Review the parts list and make sure that no parts
are missing.
IMPORTANT – DO NOT RETURN
TO THE STORE
For assistance with your Rubbermaid Storage Building
or for additional product information call our toll-free
Consumer Service number: 1-888-895-2110
M–F: 8:30 a.m. to 5:00 p.m. EST
76¾"
Installation Steps:
1. Site Preparation
2. Floor
3. Walls
4. Roof & Doors
5. Finishing
51½"
55 ¼"
Note: Be sure to keep this instruction manual and your original store receipt to ensure our Consumer Service
Department can accurately and quickly assist you if necessary.
1780069
CAUTIONS
CARE & USE
• Shed can be cleaned with water and mild detergent as
necessary. DO NOT USE ABRASIVE DETERGENTS,
MATERIALS OR CLEANING TOOLS.
• To maximize your shed’s performance, remove
excessive snow and/or leaf accumulation from the roof.
• In the event of severe weather, please disassemble
and store in a secure location.
CAUTION: Always use gloves when using a utility knife.
CAUTION: Always use eye protection/safety glasses
during assembly.
CAUTION: When installing screws, do not overtighten.
CAUTION: Drill only through initial panel wall, unless
otherwise indicated.
1.0 Site Preparation
FLOOR PLAN:
Size the construction site to fit the entire floor.
OPTIONAL STEP:
If desired, recessed anchor locations (8 places)
can be used to anchor the shed floor to a foundation
after you have constructed one.
24"
24"
~3-5/8"
~3-5/8"
~4-15/16"
~23-9/16"
~51-1/2"
51½"
ANCHOR
LOCATIONS
18"
55¼"
~5"
~55-1/4"
Build a solid, level surface for the shed foundation. Consult your local
building authority for ordinances, restrictions, or permits required
before building any structure at your home.
120.0°
24-7/8"
Maximum opening
Note: Minimum dimensions for foundations shown.
2.0 Floor Installation
Using a utility knife, cut the long side of each wall slot
b. tab and then use a rubber mallet and screwdriver to
B
knock it completely out:
A
• 4 places on Front Floor (A)
• 8 places on Repeat Floor (B)
Using a rubber mallet and
a. screwdriver, punch out
the screw holes along
the connection edge
of Repeat Floor (B).
B
A
1.
2.
B
Using a rubber mallet and screwdriver, knock out the
Drill pilot hole through top surface of floor, 2 places on
c. tabs for the door hinge, 2 places on Front Floor (A).
d. Front Floor (A).
CAUTION: Drill through top surface of floor only!
A
A
2.1 Floor Installation
Connect and align Repeat Floor (B) to Front Floor (A) and install Screws (AA)
a. 9 places; keep panels aligned and even while installing screws.
HELPFUL HINT: Pilot holes may be drilled for the screws using a 1/8" drill bit.
CAUTION: Do not overtighten screws.
AA (9)
B
A
3.0 Wall Panel C Installation
Using a screwdriver, punch out the screw holes on the
a. top of Repeat Left Side (C) 2 places.
Screw Holes
C
C
Snap Repeat Left Side (C) into the back position of
Hold Repeat Left Side (C) upright to prevent it from
b. Repeat Floor (B).
c. falling (until Left Back (D) is installed).
C
C
ALIGN
click
ALIGN
3.1 Wall Panel D Installation
Using a screwdriver, punch out the screw holes on the
a. top of Left Back (D) 4 places.
Screw Holes
D
D
Connect Left Back (D) into dovetails of Repeat Left Side (C).
Engage snaps on bottom of Left Back (D) into
b.
c. Repeat Floor (B).
HELPFUL HINT: Lubricate dovetails with liquid soap.
D
D
D
1
OVERHEAD VIEW
2
1
C
click
2
B
ALIGN
ALIGN
3.2 Wall Panel E Installation
Using a screwdriver, punch out the screw holes on the
a. top of Repeat Right Side (E) 2 places.
Screw Holes
E
E
|